A starting point for every project role

Find the right place to start for owners, contractors, design and MEP teams, or operations teams.

What to do first, by role

Teams on the same project face different obstacles. Here are common examples and practical first steps.

01

Developers & project owners

Many issues span consultants, but it is not clear what the owner must decide or where schedule and budget are exposed.

A good place to start

Create one issue register with decisions, owners and deadlines, then use it in weekly reviews.

02

General contractors & site teams

Trade handoffs stall, drawing revisions get mixed up, or approved changes do not make it back to site.

A good place to start

Start in one work zone. Connect drawing revisions, constraints, release criteria and field checks.

03

Architecture, structural & MEP teams

Disciplines work with different models, so comparing equipment and routing changes takes extra coordination.

A good place to start

Pilot one interface clash: locate it in BIM, compare options and assign ownership.

04

Handover & facility operations

Asset data, maintenance locations and field changes live in separate files, forcing operations teams to rebuild the record.

A good place to start

Agree the register fields, model locations and handover documents for critical equipment first.

A design clash, from start to finish

Each stage identifies who takes over, what they decide and what information the next team needs.

01

Raise: identify the blocker

Include the model location, drawing revision, photos and decision deadline.

A good place to start

A location-linked issue record.

02

Review: compare options and impacts

Review headroom, clearances, sequencing and schedule together.

A good place to start

An options brief with constraints and tradeoffs.

03

Approve: put the decision with its owner

Record the decision, owner and approved revision. Notify affected teams.

A good place to start

Approved drawings, model revision and decision log.

04

Verify: close the loop on site

Verify the result against the approval and file evidence before closing the issue.

A good place to start

Verification, closure and handover record.